Page Areas:



Additional Information:

Location

Science Park 3

We are located on the second floor of the Computer Science Building (Science Park 3) ...  more of Location (Titel)


Position Indication:

Content

Applications

Applications for follow-up projects

FWF projects
(with an indication of the project type, e.g. stand-alone project, NFN, SFB, WK, fellowship, contribution to a stand-alone publication)

  • “Consistency Change Propagation in Design Models” funded by Austrian FWF under agreement P 25289-N15. This work investigates how consistency constraints can be used to help cope with changes.

Other national projects
(e. g. FFG, CD Laboratory, a K-plus Centre, funding from the Austrian National Bank, the Federal Government, the provincial government or similar)

  • “Study on Model Consistency and Variability in Mechatronical Engineering” funded by the ACCM Strategic Research Grant A210101. This work investigates consistency checking, model transformation, and variability in context of mechatronical engineering.

International projects
(eg. ERA project, ESF)

  • “Incremental, Multi-User Consistency Checking” funded by IBM CAS SRG Project 817. This work investigates consistency checking for multiple, distributed software engineers.
  • “Adaptive Multi-Platform Systems AMPS” ICT Call 10 (technically not a follow-up project but this proposed benefited from the methodology developed under this work)
  • “Resilient Collaborative interGratioN and adaptation of Services for sMEs (RECOGNISE-ME)”, ICT Call 10 (technically not a follow-up project but this proposed benefited from the methodology developed under this work)